Do you hang drywall on the ceiling or wall first? How do you tell if a wall is drywall? Measuring from the wall, install the remaining strips at inch intervals across the ceiling.
How to install drywall on a basement ceiling? Fasten each so the center is right at the inch mark to be sure the 4xft drywall sheets will be supported along each edge. At the end of the ceiling there will be something other than inches left.
When installing the drywall ceiling start from a corner, making sure the boards are as close as possible to the walls. If the corners of the room are not right angle you should cut the drywall panels as to fit perfectly into place. All edges of the drywall boards should be fastened to the ceiling studs. Remember, a sheet of drywall is feet , or inches wide.
Press the drywall in place over electrical boxes then lower it and cut out the indentation with a spiral saw. Finish with drywall tape and three coats of compoun sand in between coats. It is critical that you allow each coat of compound to dry for hours and sand it smooth before applying the next coat. Building the frame is one of the most important steps since it sets the tone for the rest of the project.
When framing with wood studs, your construction will either run parallel or perpendicular to the ceiling joists. Use a laser or level to get it right. Use the same procedure to attach this half-piece of drywall as you used on the first row of drywall. Businesses Choose Zoro. If this number is less than feet, you can buy one strap for each length.
Pick the best combination of strap lengths to achieve the ceiling. You mud the backside, create a 2xT to hold it tight against the ceiling and then nail it in with concrete nails. You can also rent a drywall hoist to push it tight to the ceiling.
If the ceiling is tall you can build a frame (essentially a drop ceiling ) then screw onto that. Mark onto the drywall the location of any lights or vents in the ceiling. When framing your ceiling , if the ceiling joists are not going in the same direction as the roof rafters, by 4s are added running in the same direction as the rafters. Space these boards ft.
Pan head screws are used to attach the track to the studs. Track is used as a channel to hold the studs. Secure the furring with glue and nails.
Measure from the end of the ceiling to the middle of a joist and cut the sheet to length. End cuts should split framing members. Mark fastening guidelines every in. STARTING AT ONE END OF THE NEW WALL, SHIM BETWEEN THE TOP PLATE AND CEILING AND CHECK THE WALL FOR PLUMB WITH A LEVEL As you shim and plumb each section of wall, drive 16d nails through the top plate into the framing.
Fasten the bottom plate by driving 16d nails through it into the floor. Nail the end studs to framing in the existing wall. Install the top row of panels first, pushing each panel up as tight as it will go against the ceiling.
The hardest part is getting it attached to the ceiling without a helping hand. Framing basement ceilings is a breeze when you add the element of soffits to the ceiling project. Just about anything can be hidden in your basement ceilings by applying soffit framing techniques.
Drywall furring channel is installed perpendicular to the cold rolled channel at o. On the bottom row, use a drywall lifter to pry the panel ½ inch up from the floor to allow for shrinkage of the framing) As on the ceiling, offset the end joints from those in the previous row by at least feet. Hang panels right over the bottoms of the window openings, making sure the seams don’t line up with the corners. If the wall is running perpendicular to the ceiling joists, you. If not, add another 2xalongside the existing framing (right).
Especially check along the top of walls that run parallel to the ceiling framing.